KloBER Uni Dry Verge Fixing Instructions

1. Trim fascia board flush with the verge

2. Felt roof as normal, allowing a 10mm overhang at each verge, unless also using the Klobber Uni-Dry Ridge System, in which case the underlay must be left 30mm short of the apex on both sides to allow ventilation.

3. Set out tiling battens, ensuring that they overhang the gable wall or bargeboard by 20mm. Do not fix top battens if using the Uni-Dry Ridge System

4. Fix a Batten End Cap to the end of the first batten with two clout nails. Do the same on each batten, either all at this stage, or one by one as you work up the roof.

5. Lay the right hand and left hand eave tile on its batten in accordance with the tables below:

 

Table A

Renown
Redland 50
Regent
Redland 49
Grovebury
Norfolk Pantile

Right Hand Verge

Flush with end of batten
15mm in from end of batten
15mm in from end of batten
15mm in from end of batten
25mm in from end of batten
Flush with batten end

Flange Cover

65
40
40
40
30
55

 
 

Table A

Renown
Redland 50
Regent
Redland 49
Grovebury
Norfolk Pantile

Left Hand Verge

Flush with end of batten
15mm in from end of batten
15mm in from end of batten
15mm in from end of batten
25mm in from end of batten
25mm in from end of batten

Flange Cover

55
40
40
40
30
30

 

6. Snap out the appropriate upstand on an Eaves Closure to match the hand. Slide it over the bottom corner of the tile as far as it will go. With the unit butting neatly with both the top and side edge of the tile, and with the nails provided, nail through two holes in the Eaves Closure into the end of the fascia board.

7. Position first the Right Hand Verge Unit over the open face of the Eaves Closure and slide it up following the direction of the verge until it locks into position. It is engaged correctly when the lug of the Eaves Closure protrudes through the end of the Verge Unit and no outward movement is possible at the bottom edge of the Verge Unit. Nail (using 50mm long large headed galvinsed nails) through an appropriate hole in the top of the Verge Unit so that the nail goes through the Batten End Clip in the end of the batten.

8. Take another verge tile and lay it on the next batten having first made sure that a Batten End Clip is nailed into position.

9. Engage a second Right Hand Verge Unit over the first, sliding upwards until it butts up against the bottom edge of the tile and firmly locks into position. Nail through an appropriate hole into the end of the batten through the Batten End Clip.

10. Repeat this process up the right hand verge to the ridge, then do the same on the opposite verge, this time using the Left Hand Verge Unit.

11. When the top Verge Units are in position, insert the Ridge Closures. There are separate left and right hand Ridge Closures. Ensure the combs are on the inside and facing towards the apex. The combs then interlock to produce a bird guard.

12. To finish off the verge at the apex, take the Ridge End Cap and fit it over the top of the ridge tile. Using the screws provided, screw into the Ridge End Cap through the desired blind nail holes and through the end of the ridge end batten.

13. If using the Klobber Uni-Dry Ridge System see appropriate fixing instructions provided. If all parameters are dry fix then cut off the spiggot on underside of the Ridge End Cap.

 

~~~3462~3464~~
Layout Table~~~~3462~3486~~
New Link Item~~~~3462~3488~~
New Link Item | Menu Page | Toolbar Page |
Frameset Page | Index Page | Table of Contents
EROL - Electronic Retail Online E-commerce shopping cart software